Greenfield Mining Project

Greenfield Mining Project

A Copper Mine was looking at power generation alternatives between a grid tied vs an off-grid power solution.

Case Study:
The Approach:

A prefeasibility study was completed to ascertain if a solar, battery and diesel hybrid solution would be cost effect at a greenfield mine site.

The Solution:

A solar, battery and diesel power solution was considered the most reliable and cost effective for the copper mine project.

The Results:

~30% cost saving by implementing a hybrid off-grid power solution.